In recent years, special-purpose trains have become increasingly important in railway construction. RailMac, a leading company in the industry, has developed a range of special-purpose trains that have played a crucial role in multiple railway construction projects, significantly enhancing construction efficiency and safety.Railway construction often requires the transportation of large equipment, materials, and personnel. Traditional transportation methods are inefficient and challenging to operate in complex terrains and harsh environments. To meet the unique needs of railway construction, RailMac has introduced several types of special-purpose trains, including track vehicles, rescue trains, and bridge-laying machines, which are designed to be efficient, flexible, and safe
Related Producsts with this tag:
Mining
Driving Intelligent Mining Development
RailMac has made significant strides in the field of underground mining trains. The company’s mining trains and intelligent scheduling systems have been successfully applied in multiple mining projects, greatly improving mining transportation efficiency and intelligence.Transportation is a critical aspect of underground mining operations. Low efficiency, high labor costs, and significant safety risks plague traditional transportation methods. To meet the demand for efficient, safe, and intelligent mining transportation, RailMac has introduced mining trains and a matching intelligent scheduling system.
1.5T Trolley Locomotive
Application: Mining
Hourly System Traction: 2.55~3.24 kN
Max. Traction: 3.68 kN
Hourly System Speed: 4.45~6.6 km/h
Supply Voltage: 100~250 V
Power of Electric Motor: 3.5 kW*1 or 6.5 kw*1
3T Trolley Locomotive
Application: Mining
Hourly System Traction: 7.5~10.6 kN
Max. Traction: 7.36 kN
Hourly System Speed: 7.5~10.6 km/h
Supply Voltage: 250~550 V
Power of Electric Motor: 12 kw*1 or 24 kw*1 or 6.5 kw*2
7T Trolley Locomotive
Application: Mining
Hourly System Traction: 13.05~15.16 kN
Max. Traction: 17.2~18.2 kN
Hourly System Speed: 9.8~11 km/h
Supply Voltage: 250~550 V
Power of Electric Motor: 21 kW*2 or 22 kw*2 or 24 kw*2
10T Trolley Locomotive
Application: Mining
Hourly System Traction: 13.05~19.13 kN
Max. Traction: 24.5~26 kN
Hourly System Speed: 9.8~11 km/h
Supply Voltage: 250~550 V
Power of Electric Motor: 21 kW*2 or 22 kw*2 or 24 kw*2 or 30 kw*2
14T Trolley Locomotive
Application: Mining
Hourly System Traction: 26.68~27.16 kN
Max. Traction: 34.3~36.4 kN
Hourly System Speed:11.2~12.87 km/h
Supply Voltage: 250~550 V
Power of Electric Motor: 45 kW*2 or 52 kW*2
20T Trolley Locomotive
Application: Mining
Hourly System Traction: 37.3~41.04 kN
Max. Traction: 49~52.9 kN
Hourly System Speed: 10.5~18.6 km/h
Supply Voltage: 550~750 V
Power of Electric Motor: 65 kW*2 or 75 kw*2 or 78 kw*2 or 85 kw*2 or 110 kw*2
30T Trolley Locomotive
Application: Mining
Hourly System Traction: 43~60 kN
Max. Traction: 72~78 kN
Hourly System Speed: 12.73~13.2 km/h
Supply Voltage: 550 V
Power of Electric Motor: 85 kW*2 or 110 kw*2








